Track your calories in WhatsApp.
Free AI fitness tracker, living directly in your WhatsApp or Telegram. Say what you ate, or snap a photo. Just chat. The calories are figured out for you. No download — open the chat you already have and start tracking now.
Launching October 1, 2026
Your calorie tracker is already installed.
Just open WhatsApp and send a message, even right now. Here is how that looks like ↓
Two eggs on toast.
“I just say two eggs on toast and it figures it out.”
No dropdowns, no search boxes, no portion pickers.
The fastest way to log anything: say it, and it is done.
Food, the way you say it.
Type it, or snap a photo — food or label.
Use any unit — grams, ounces, cups, tablespoons, servings…
Tracking water is included.

241gFood is just the start.
Track a wide range of activities and metrics, each with its own world of logging possibilities.
The examples here barely scratch the surface.
And nothing you log is set in stone.
Change or remove entries, in the same plain words.
Rich stats and summaries. In chat.
A couple of letters get you the whole day. Look at the summaries below.
And add a date to look back.
Goals and targets. Automated.
Share your body stats once and the numbers are done.
Daily targets for calories, protein and steps.
And when your body moves, the targets follow. All under your control.
Dashboard. Your progress, visualized.
Type dashboard or d, and your browser does the rest.
Track faster. And easier.
Ease of use keeps your tracking consistent.
- Open WhatsApp or Telegram
- Type what you ate
Other apps
- Open the app
- Wait until it loads
- Tap the 'Add' button
- Tap the food icon
- Search for a food
- Pick the food from the list
- Pick the unit from a dropdown
- Type the portion size
- Confirm
Every food is remembered.
So the next log needs nothing but the name.
Updates automatically with the latest portion.
Unbeatable pricing.
And the free plan works forever. No trial and no expiration.
Free
$0 / forever
- Full dashboard access
- 30 AI messages / month
- 5 photos / month
- Non-AI logging
- 18 languages
- Metric or imperial units, formats
- Full data encryption
Premium
$4.99 / month
or $39.99 / year (121 free days)
Everything in FREE, plus:
- Unlimited AI messages
- 300 photos / month — meals, labels, progress photos